35th Ave. NE and Tyler St. NE storm drain improvements
Dates
2020 - 2021
Location
35th Ave. NE from Central Ave. NE to Ulysses St. NE, and Tyler St. NE from 35th Ave. NE to 36th Ave. NE. Waite ParkProject overview
The storm sewer along 35th Ave. NE was installed in 1963, and the storm sewer along Tyler St. NE was installed in 1964. Both need to be rehabilitated. We’ll replace roughly 4,300 feet of reinforced concrete pipe ranging in size from 24 inches to 72 inches. We’ll also replace manholes and catch basins. At the same time, we’ll rehabilitate concrete panels where needed on both streets.
2020 - 2021
We expect to begin construction in the spring of 2020.
Work on the storm main will continue through 2020, and paving work may continue into Spring 2021.
Traffic impacts
Expect the following temporary traffic impacts:
- Detours
- Lane restrictions
- Intersection reductions
- Parking restrictions
- Revised pedestrian and bicycle routes
Residents, businesses and visitors may experience:
- Noise
- Vibration
- Dust in work areas
You’ll be able to access property throughout construction.
Project phase
This project is complete.
Input
Design
In Progress
Complete
Contact us
Lisa Goddard
Senior Professional Engineer
Surface Water & Sewer
Public Works