4th Ave NE sewer improvements

The City will remove and replace 280 feet of clay pipe. We'll also replace manholes.

Key information

Dates

2023

Location

4th Ave NE from 4th St to 5th St NE

St. Anthony West

Project overview

We've determined the following sanitary sewer needs rehabilitation:

4th Ave NE from 4th St NE to 5th St NE

Year installed: 1965

What we'll do

  • Remove 280 feet of 9” clay pipe and nearby manholes due to pipe being in poor condition
  • Replace with 280 feet of 10” clay pipe.
  • Replace manholes

Background

We assess sewer system conditions on a regular basis to:

  • Find infrastructure rehabilitation (rehab) needs
  • Check over the aging sewer system
  • Maintain and improve the system
  • Keep the system reliable
  • Using the condition and risk data, we focus on the sewers with the most rehab needs.

 

View interactive map

 

 

Traffic impacts

We expect some minor traffic impacts.
 
The following temporary traffic impacts may occur:
 
  • Detours
  • Lane restrictions
  • Intersection changes
  • Parking restrictions
  • Revised pedestrian and bicycle routes
 
Residents, businesses and visitors may experience:
 
  • Noise
  • Vibration
  • Dust in work areas
 
You’ll be able to get to your property throughout construction.

Project phase

This project is in the design phase.

Input

Design

In Progress

Complete

Contact us

Henneh Kota

Engineer I
Surface Water & Sewers
Public Works

Phone

612-816-9047