Green Central Safe Routes to School
Dates
2021-2024
Location
E 34th St (Clinton Ave – 10th Ave), 10th Ave S (E 34th St – E 28th St), and 11th Ave S (E 34th St – E 28th St) Central Midtown Phillips Powderhorn ParkProject overview
Project details
The Green Central Safe Routes to School (SRTS) project will update 1.3 miles of walking and bicycle paths on East 34th Street and 10th/11th Avenues South.
The updates will help people of all ages and abilities.
This project will build a safe connection to Green Central Elementary School, other bikeways, parks, and important destinations in the area.
Safe Routes to School projects
Project updates
2024 Capital Project
The proposed concept layout for E 34th Street and 10th Avenue S are now available. Public Works will bring the project through the Minneapolis City Council Public Works and Infrastructure (PWI) Committee to approve the proposed layout on Thursday June 8th, 2023 at 1:30pm.
See the proposed concept layout
Note: This layout may take additional time to load due to large file size.
2023 Demonstration project
A demonstration project was installed along East 34th Street from Clinton Avenue to Park Avenue. The project’s goal is to test changes with non-permanent materials for the upcoming 2024 Green Central Safe Routes to School project that will install permanent improvements. The project will make walking and bicycling to school easier, safer, and more enjoyable for students. This demonstration project features:
- Crossing enhancements, including marked crosswalks at Clinton Ave @ E 34th St.
- Curb extensions at Clinton Ave @ E 34th St to help narrow the crossing distance for children walking to school.
- An in-street bollard protected two-way bikeway from Clinton Ave to Park Ave along the south side of E 34th St.
- There will still be access to all driveways and alleys on E 34th St.
- The demonstration project was installed on April 27, 2023. The project will remain in place until construction begins for permanent improvements in the Spring of 2024.
Survey
See the 2023 Demonstration project summary & survey result summary
Provide feedback on the corridors
Project resources
Project information
We provide information about the Green Central SRTS project.
Green Central SRTS project info
Mpls Green Central SRTS demo sign before - Spanish
Mpls Green Central SRTS demo sign before
Mpls Green Central SRTS demo project summary
Complete streets checklist
We use a checklist to review details for the Green Central Complete Streets.
Project phase
This project is in the design phase.