Green Central Safe Routes to School

The City will make walking and bicycle safety updates near Green Central Elementary School.

Key information

Dates

2021-2024

Location

E 34th St (Clinton Ave – 10th Ave), 10th Ave S (E 34th St – E 28th St), and 11th Ave S (E 34th St – E 28th St)

Central Midtown Phillips Powderhorn Park

Project overview

Project details

The Green Central Safe Routes to School (SRTS) project will update 1.3 miles of walking and bicycle paths on East 34th Street and 10th/11th Avenues South.

The updates will help people of all ages and abilities.

This project will build a safe connection to Green Central Elementary School, other bikeways, parks, and important destinations in the area.

 

View interactive map

 

Safe Routes to School projects

For more information on other Safe Routes to School (SRTS) safety improvements, visit the Safe Routes to School program page.

Project updates

2024 Capital Project 

The proposed concept layout for E 34th Street and 10th Avenue S are now available. Public Works will bring the project through the Minneapolis City Council Public Works and Infrastructure (PWI) Committee to approve the proposed layout on Thursday June 8th, 2023 at 1:30pm.

See the proposed concept layout

Note: This layout may take additional time to load due to large file size.

 

2023 Demonstration project 

A demonstration project was installed along East 34th Street from Clinton Avenue to Park Avenue. The project’s goal is to test changes with non-permanent materials for the upcoming 2024 Green Central Safe Routes to School project that will install permanent improvements. The project will make walking and bicycling to school easier, safer, and more enjoyable for students. This demonstration project features:

  • Crossing enhancements, including marked crosswalks at Clinton Ave @ E 34th St.
  • Curb extensions at Clinton Ave @ E 34th St to help narrow the crossing distance for children walking to school.
  • An in-street bollard protected two-way bikeway from Clinton Ave to Park Ave along the south side of E 34th St.
  • There will still be access to all driveways and alleys on E 34th St.
  • The demonstration project was installed on April 27, 2023. The project will remain in place until construction begins for permanent improvements in the Spring of 2024.

See the demonstration project

 

Survey

See the 2023 Demonstration project summary & survey result summary

Provide feedback on the corridors

The City has created an interactive map that you can use to provide feedback on the project.

Project phase

This project is in the design phase.

Input

Design

In Progress

Complete

Tree lined street with parked cars.
11th Ave
Tree lined street with parked cars.
34th St
Tree lined street with large buildings in background.
10th Ave

Contact us

Jasna Hadzic-Stanek

Transportation Planner
Public Works

Phone

612-673-3278

Kristian Zimmerman

Transportation Planner
Public Works

Phone

612-673-5011

Adam Hayow

Project Engineer

Public Works

Phone

612-673-2172