Humboldt Ave S sewer replacement

The City will replace 535 feet of the existing storm sewer pipe in the area.

Metropolitan Council Contact

Do you have questions during construction? Please contact Chad Davison with MCES or email info@eastislessewerproject.com.

East Isles Sewer Improvements project

Visit the Metropolitan Council website for overall project updates.

Key information

Dates

2022

Location

Humboldt Ave S from The Mall to south of W. 28th St

Lowry Hill

Project overview

We'll replace 535 feet of the existing storm sewer pipe with a larger diameter pipe to better convey stormwater from the area.

We'll also add inlets to:

  • reduce flooding at the low point of the street

To fit the larger storm pipe, we'll:

  • shift 555 feet of watermain to the west
  • replace 405 feet of the 114-year old sanitary sewer with new pipe

Our work will be part of a larger project that the Metropolitan Council manages:

The East Isles Sewer Improvements project will construct sanitary force mains between The Mall and W. 27th St. Timing the two projects together will reduce impact to area residents.

View project map

Traffic impacts

During storm sewer project construction between The Mall and W. 27th St:

  • Humboldt Ave will be closed to through traffic and only open to local traffic
  • Part of the road within The Mall will also be closed.
  • Traffic will be detoured around the construction area.

The Midtown Greenway will remain open with a short bypass around the construction.

Other roads may be closed and detoured as the Metropolitan Council completes the rest of their sanitary force main project.

For more details on traffic impacts:

See the Metropolitan Council's East Isles Sewer Improvement project page

Project phase

This project is complete. 

Input

Design

In Progress

Complete

Contact us

Lisa Goddard

Senior Professional Engineer
Surface Water & Sewer
Public Works

Phone

612-673-2096

Kristi Halicki

Professional Engineer
Surface Water & Sewers
Public Works

Phone

612-673-5632